top of page


Generator Transfer Switch
We installed this 6-circuit manual transfer switch so our customer could safely power the essentials with their portable generator.
mike30065
Feb 1, 20231 min read


New Construction
Installed a high efficiency furnace, air conditioning, ductwork, propane gas piping, and more for this new home build in Ellicottville, NY.
mike30065
Jan 30, 20231 min read


High Efficiency Furnace
We installed this high-efficiency furnace plus central air conditioning for this customer.
mike30065
Oct 4, 20221 min read


Water Heater Replacement
50-gallon Water Heater Install
mike30065
Sep 23, 20221 min read


High Efficiency Furnace Installation
We removed the existing furnace and air conditioner and replaced it with a 95% efficient 2-stage furnace, new central air system,...
mike30065
Sep 10, 20221 min read


Tankless Water Heater plus 3-Stage Filtration
A 50-gallon water heater was not keeping up with this growing family so we replaced it with this Navien tankless system plus added a...
mike30065
Sep 8, 20221 min read
bottom of page
.jpg)